Client
Severoslovenské vodárne a kanalizácie, a.s.
Main contractor
TuCon, a.s.
Construction period
May 2017 – December 2017
Description of the objects:
- BO 01 Reconstruction of the water main
- BO 02 Reconstruction of the sewerage system
Realized Works:
Trench excavation with installation of trench boxes, installation of sewerage pipeline – fiberglass DN 400, water pipeline HDPE DN110.
Installation of the sewerage connections to the new sewerage system.
Installation of the drink water connections to the new water pipeline.
Filling of the trenches with a gravel sand.
Final surfacing of the road by asphalt.