Client
Slovenská správa ciest, Bratislava
Superior Contractor
Branisko Consortium represented by Vodohospodárska výstavba, Bratislava
Construction period
May 1997 – June 2002
Construction technology and completed structures:
- waterproofing of the right tunnel tube 65 000 m2
- armouring and concreting works at secondary lining of the lower vault in 2 440 m length, 5 100 m3 of concrete mixture
- armouring and concreting works at secondary lining of the upper vault in 2 440 m length, 18 800 m3 of concrete mixture
- armouring and concreting works of tunnel tube interslab in 2 440 m length, 4 500 m3 of concrete mixture,
- sewer system and drainage of tunnel in the length of 2 440 m
- road stabilization, construction of pavements, installation of ducts for LV, HV and telecommunication networks distributions
- 2500 m long fire water-main, tunnel architecture